How to Repair Internal Leakage of Spiral Plate Heat Exchanger
Repair of internal leaks in the
screw plate heat exchanger:
1. Digging holes: After determining the position of the internal leakage point, start cutting holes from the place where the outer layer of the heat exchanger corresponds to the leakage point. The order is from the outside to the inside, until the layer with the internal leakage point is cut.The holes cut out should be elliptical, and the size of the outer layer is large, and the size is gradually smaller inward. Generally, the size of the holes on each layer of plates differs by 40mm. If the leak point is deep, the holes cut out of the outer layer should be larger.
II. Slag cleaning: After cutting the holes, the oxidized slag left on each layer of plate should be carefully cleaned. This is the key to whether the patch plate and each layer of helical plate can be tightly welded when welding the patch plate. The oxidized slag can be cleaned by small hand grinding wheels for trowels and trimming molds. Attention should be paid to remove the cleaned slag as much as possible to prevent it from falling into the equipment.
3. Assemble the patch plate: In order to ensure the quality of the repair, the sheets cut from each layer of the helical plate heat exchanger will not be reused, and the patch plate will be reassigned. The additional patch plate should use the same material and plate thickness as the equipment, and its periphery should be 15mm ~ 20mm larger than the holes cut out from each layer of the heat exchanger, and it is also elliptical, and made into an arc shape consistent with the arc of each layer of the helical plate of the equipment.
IV. Welding leakage points and patch plates:
1. When welding the internal leakage point, carefully check whether the leakage point is a crack or a sand hole. If necessary, you can use a hand grinding wheel to clean the leakage point and grind out the groove to ensure the welding quality.
2. When welding, J422 welding electrode is used, the diameter of the welding electrode is 3.2mm, and the current control is between 100-120A. First weld the leakage point and then weld each layer of the patch plate, and weld from the inside to the outside layer by layer.
3. The elliptical repair plate is welded by clinging to the inner arc surface of the helical plate heat exchanger. The purpose is to "facilitate operation and ensure welding quality".
4. In order to smoothly install the elliptical patch plate into the equipment, weld a piece of round steel on the patch plate, spot weld the elliptical patch plate, and then remove it.
5. There is also a short-circle steel support welded between each layer of the patch plate (mainly to increase the mutual stiffness of the elliptical patch plate).The number of short-circle steel supports welded on each patch plate is determined by the size of the patch plate. Generally, 23 patches are welded on a few larger layers of patch plate on the outside, and 1-2 patches are welded on the patch plate on the inner layer.
6. Because the outer steel plate is δ12mm thick, the original cut steel plate can be directly installed in the original position for alignment and welding.
7. It should be done in welding. After welding each layer of elliptical repair plate, the welding position should be carefully checked. If there is a trachoma, repair welding should be carried out to ensure the welding quality of each layer.