Welcome to [Wuxi Chemical Equipment Co., Ltd.] website!

咨询热线:

Analysis of Equipment Fault Handling Methods by Heat Exchanger Manufacturers

       During the production process, due to the water erosion, cavitation and a small amount of chemical media corrosion of the tube plate of the spiral plate heat exchanger, leakage often occurs at the weld of the tube plate, resulting in the mixing of water and chemical materials, the production process temperature is not well controlled, resulting in the generation of other products, seriously affecting product quality, reducing products and other categories.After the pipe plate weld leakage, the heat exchanger manufacturers usually use the traditional repair welding method to repair, the internal stress of the pipe plate is easy to produce, and it is difficult to eliminate, resulting in leakage of other equipment. The heat exchanger manufacturers check the repair of the equipment through suppression, repeated repair welding and experiments. It takes 2 to 4 people a few days to complete the repair. After a few months of use, the pipe plate weld is corroded again, which brings waste of manpower, material resources and financial resources to the enterprise and increases the production cost.
Through the corrosion resistance and erosion resistance of polymer composite materials, through the protection of the equipment in advance, not only the weld and trachoma problems of the equipment are managed, but also the metal surface and welding points of the equipment are eliminated after the use of chemical substances. In the subsequent periodic maintenance, the polymer composite material can also be coated to protect the exposed metal. Even if there is a leakage phenomenon after use, it can be repaired in time through technology, so as to avoid the impact of long-term surfacing maintenance on production.
       It is precisely because of this refined management that the probability of leakage of the helical plate heat exchanger is greatly reduced, which not only reduces the cost of equipment procurement, but also ensures product quality, production time, and improves product competitiveness.

 
1372 次

相关文档

Copy right © 2019 Wuxi Chemical Equipment Co., Ltd. All Rights Reserved Website Design: Wuxi Wangke