Installation Key Points of Shell and Tube Condenser

       Installation points:
       1. Shell and tube condensation should be tested for water pressure at 1.5 times the maximum working pressure. The steam part should not be lower than the steam supply pressure plus 0.3MPa; the hot water part should not be lower than 0.4MPa. Under the test pressure, keep the pressure without falling for 10 minutes.
       2. There should be space for removing the pipe bundle at the front end of the equipment, that is, the distance between its head and the wall or roof should not be less than the length of the heat exchanger, and the net width of the shell-and-tube condensation operation channel should not be less than 0.8m.
       3. The installation height of each valve and instrument should be convenient for operation and observation.
 