Welcome to [Wuxi Chemical Equipment Co., Ltd.] website!

咨询热线:

How to Clean Stainless Steel Reactor in Winter

       The winter is cold and the climate is dry. The use of high and low temperature test chambers will cause adverse effects, such as insufficient heating and easy fires. How to clean the stainless steel reactor in winter?
       1. It is cold in winter, so experiments are conducted in a high and low temperature laboratory because the laboratory temperature is maintained above 15℃ and above 35℃;
       2. Check whether the system settings are correct and meet the winter test requirements;
       3. Inflammable, explosive, strong radiation, and high corrosion tests are not allowed;
       4. Ensure that there is no strong influence around vibration and electromagnetic fields;
       5. Ensure good grounding of the stainless steel reactor;
       6. There are no specific requirements for the test process, and the door of the high and low temperature test chamber is not allowed to be opened;
       7. Test equipment is not allowed to be carried or repaired while the power equipment is in operation;
       8. The power supply voltage must be within the rated range and operated within specifications to avoid electric shock;
       9. When opening the test room door at the end of the test, pay attention to high-temperature burns or low-temperature frostbite, and use anti-scald gloves in front of the door;
       10. Pay special attention to fire prevention in dry winters. Heat will be generated when the laboratory is used. Keep away from flammable and explosive items, and install the equipment in a well-ventilated place;
       11. Regularly inspect and maintain the high and low temperature test chamber to eliminate hidden worries and take precautions first.
  
       Please indicate the source for reprinting: http://www.jshh.com
 
1391 次

相关文档

Copy right © 2019 Wuxi Chemical Equipment Co., Ltd. All Rights Reserved Website Design: Wuxi Wangke